NPDES SDR10P5RM · Clean Water Act
MEN'S LEVEL V CORRECTIONAL FACILITY, Sioux Falls, SD: NPDES SDR10P5RM discharge permit, effluent exceedances, inspections, penalties
MEN'S LEVEL V CORRECTIONAL FACILITY, Sioux Falls, South Dakota: General permit coverage SDR10P5RM, held by Bureau of Human Resources and Administration; Construction stormwater; Effective; issued November 25, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 1,005 were issued before SDR10P5RM. Bureau of Human Resources and Administration holds 2 permits in South Dakota.
Other permits held by Bureau of Human Resources and Administration
- NEW DOH PUBLIC HEALTH LABORATORY, Pierre: SDR10P56U, issued 2024-05-31
Coverages issued nearest SDR10P5RM
- 2025-11-12: COLORADO BLVD SEWER UPSIZE PHASE 2, Spearfish: SDR10P5K0, held by Woelber Excavating
- 2025-11-13: STANDING ROCK CORSON COUNTY BURIED CABLE INSTALLATION, Mcintosh: NDR10I06E, held by Standing Rock Telecom, Inc.
- 2025-11-19: CORTRUST BANK SITE IMPROVEMENTS, Sioux Falls: SDR10P5OB, held by Cortrust Bank
- 2025-11-25: CLEAR LAKE MAIN LIFT STATION & FORCEMAIN, Clear Lake: SDR10P5RG, held by City of Clear Lake
- 2025-11-25: AURORA WATER SYSTEM IMPROVEMENTS PHASE 1 WATER TOWER, Aurora: SDR10P5RH, held by City of Aurora
- 2025-11-25: 21463 STURGIS RD PIEDMONT SD 57769, Piedmont: SDR10P5RV, held by Stanley Goschke
- 2025-12-01: PCN 06JQ, Sioux Falls: SDR10P5R6, held by SD Department of Transportation
- 2025-12-01: PCN 04K7, Tyndall: SDR10P5R7, held by SD Department of Transportation
- 2025-12-01: PCN 09HV, Pierpont: SDR10P5R8, held by SD Department of Transportation
- 2025-12-01: PCN 05Q7, Estelline: SDR10P5R9, held by SD Department of Transportation
MEN'S LEVEL V CORRECTIONAL FACILITY among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5RM is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 2 years and 341 days, November 25, 2025 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MEN'S LEVEL V CORRECTIONAL FACILITY |
|---|---|
| Permittee | Bureau of Human Resources and Administration |
| NPDES ID | SDR10P5RM |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 25, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57104 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P5RM: effluent limits and exceedances
MEN'S LEVEL V CORRECTIONAL FACILITY (NPDES SDR10P5RM): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5RM: no pollutant row on file.
NPDES SDR10P5RM: inspections, violations and enforcement
NPDES SDR10P5RM (MEN'S LEVEL V CORRECTIONAL FACILITY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5RM
NPDES SDR10P5RM: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5RM
NPDES SDR10P5RM: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.