NPDES SDR10P5WW · Clean Water Act
WILLOW SPRINGS ADDITION PHASE 2, Sioux Falls, SD: NPDES SDR10P5WW discharge permit, effluent exceedances, inspections, penalties
WILLOW SPRINGS ADDITION PHASE 2, Sioux Falls, South Dakota: General permit coverage SDR10P5WW, held by Allen Development LLC; Construction stormwater; Effective; issued July 8, 2026, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 1,220 were issued before SDR10P5WW. Allen Development LLC holds 3 permits in South Dakota.
Other permits held by Allen Development LLC
- DAKOTA PRAIRIE EAST ADDITION, Sioux Falls: SDR10J163, issued 2018-08-14
- WINDMILL RIDGE ADDITION, Sioux Falls: SDR10J836, issued 2020-04-23
Coverages issued nearest SDR10P5WW
- 2026-07-08: LINE 0779 REBUILD PH2, Salem: SDR10P5VI, held by Northern States Power Company d/b/a Xcel Energy
- 2026-07-08: SOUTHEAST BASINS SANITARY SEWER IMPROVEMENTS - PHASE 1, Sioux Falls: SDR10P5VM, held by City of Sioux Falls
- 2026-07-08: SANITARY SEWER IMPROVEMENTS BLACKHAWK STREET K AVE AND M AVE, Sioux Falls: SDR10P5VN, held by City of Sioux Falls
- 2026-07-08: BASIN 204 DRAINAGE IMPROVEMENTS, Sioux Falls: SDR10P5VX, held by City of Sioux Falls
- 2026-07-08: BASIN 120 DRAINAGE IMPROVEMENTS, Sioux Falls: SDR10P5VY, held by City of Sioux Falls
- 2026-07-08: RIVER OAKS AT TWO RIVERS, North Sioux City: SDR10P5X0, held by Connelly Development
- 2026-07-08: PEAK VIEW II, Spearfish: SDR10P5Y3, held by Lloyd Construction
- 2026-07-08: 23RD AND OHLMAN UTILITY AND STREET IMPROVEMENTS, Mitchell: SDR10P5YJ, held by City of Mitchell
- 2026-07-08: HWY 471 STOCKPILE / BORROW SITE, Edgemont: SDR10P5YT, held by Western Construction
- 2026-07-08: BELLE FOURCHE MUNICIPAL AIRPORT, Belle Fourche: SDR10P5Z1, held by City of Belle Fourche
WILLOW SPRINGS ADDITION PHASE 2 among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5WW is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 2 years and 115 days, July 8, 2026 to October 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WILLOW SPRINGS ADDITION PHASE 2 |
|---|---|
| Permittee | Allen Development LLC |
| NPDES ID | SDR10P5WW |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 8, 2026 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57110 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P5WW: effluent limits and exceedances
WILLOW SPRINGS ADDITION PHASE 2 (NPDES SDR10P5WW): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5WW: no pollutant row on file.
NPDES SDR10P5WW: inspections, violations and enforcement
NPDES SDR10P5WW (WILLOW SPRINGS ADDITION PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5WW
NPDES SDR10P5WW: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5WW
NPDES SDR10P5WW: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.