EPA · Tennessee · discharge permits by parameter
Trichloroethylene in Tennessee
- 7Permits carrying a limit
- 2With a recorded exceedance
- 1,120Nationwide
A parameter is the substance or the property EPA writes a numeric limit for, and this page counts the Tennessee permits that carry one for Trichloroethylene: 7 permits, of which 2 have a recorded exceedance. Nationwide the same parameter appears in 1,120 permits. Each row below is one permit, and it opens the agency’s own record for that permit.
Permits
Other pollutants in Tennessee
- 2,4-Dimethylphenol 3
- 2,4-Dinitrophenol 3
- 4-Nitrophenol 3
- 4,6-Dinitro-o-cresol 3
- Phenol 3
- Naphthalene 5
- Pentachlorophenol 3
- Di[2-ethylhexyl] phthalate [DEHP] 6
- Di-n-butyl phthalate 3
- Vinyl chloride 5
- Polychlorinated biphenyls [PCBs] 7
- Hexachlorobenzene 3
- Floating solids, waste or visible foam-visual 145
- Phenols 5
- Rainfall 7
- Methylene blue active substances 4
- Flow, in conduit or thru treatment plant 1,398
- Chlorine, total residual 420
- E. coli 286
- Chromium III 3
What this page shows
This page covers Clean Water Act discharge permits in TN with limits on Trichloroethylene. It lists 7 permits in TN with a limit on this parameter and 7 permits in TN with a recorded violation of this parameter.