EPA · discharge permits by city
Discharge permits in Tabiona, Utah
- 4Current permits
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water |
|---|---|---|---|---|
| 2024 HANNA WATER SYSTEM EXPANSION PROJECT - PHASE 1 AND 2 | UTRC09990 | Construction stormwater | Minor | Hicken Hollow-Duchesne River |
| 2024 HANNA WATER SYSTEM EXPANSION PROJECT - PHASE 1 AND 2 | UTRC11856 | Construction stormwater | Minor | Rudy Hollow-Duchesne River |
| HANNA WATER & SEWER | UTRC13387 | Construction stormwater | Minor | |
| UDOT TABIONA TOW PLOW STORAGE BUILDING | UTRC12139 | Construction stormwater | Minor | Hicken Hollow-Duchesne River |