EPA · Washington · discharge permits by parameter
Duration in Washington
- 17Permits carrying a limit
- 3With a recorded exceedance
- 429Nationwide
A parameter is the substance or the property EPA writes a numeric limit for, and this page counts the Washington permits that carry one for Duration: 17 permits, of which 3 have a recorded exceedance. Nationwide the same parameter appears in 429 permits. Each row below is one permit, and it opens the agency’s own record for that permit.
Permits
| Permit holder | NPDES ID | City | Program | Discharger | Receiving water |
|---|---|---|---|---|---|
| US OIL & REFINING TACOMA | WA0001783 | TACOMA | Major | Hylebos Creek-Frontal Commencement Bay | |
| KING COUNTY WEST POINT WWTP | WA0029181 | SEATTLE | Publicly owned treatment works | Major | Lake Washington-Sammamish River |
| MCKINLEY PAPER COMPANY WASHINGTON MILL | WA0002925 | PORT ANGELES | Major | ||
| PHILLIPS 66 COMPANY FERNDALE REFINERY | WA0002984 | FERNDALE | Major | Terrell Creek-Frontal Birch Bay |
Other pollutants in Washington
- PCB-1254 3
- Polychlorinated biphenyls [PCBs] 49
- Captan 40
- Hexachlorobenzene 6
- Fish feed used 6
- Biomass, fish 10
- Floating solids, waste or visible foam-visual 10
- Phenols 18
- Rainfall 23
- Arsenic total, dry weight, sludge 5
- Application rate area sprayed 39
- Flow, in conduit or thru treatment plant 61
- Chlorine, total residual 189
- Chlorine, free available 4
- BOD, percent removal [total] 39
- E. coli 123
- .alpha.-Terpineol 7
- Application rate, daily spray irrigation. 38
- Oil & grease, non-polar material 16
- Number of Events 24
What this page shows
This page covers Clean Water Act discharge permits in WA with limits on the pollutant parameter Duration. It lists 17 permits in WA with a limit on this parameter and 29 permits in WA with a recorded violation of this parameter.