Watershed · by program
Storm Water Construction discharge permits in subbasin 01080107
- 11Permits
- 67Permits in the subbasin
- 3States the subbasin touches
11 of the 67 Clean Water Act discharge permits in hydrologic subbasin 01080107 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in VT, NH, CT.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 01080107 that carry that value: 11 of the 67 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 01080107
- program: POTW 4
- program: Storm Water Industrial 6
- major or minor: Minor dischargers 64
- permit type: General permit coverage 51
- permit type: Individual permits 15
Every discharge permit in subbasin 01080107 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 01080107 under the Storm Water Construction program. It shows 11 permits on this page, out of 67 permits in the whole watershed. Of the permits in the whole watershed, 51 are located in VT, 15 in NH, and 1 in CT.