Watershed · by program
Storm Water Construction discharge permits in subbasin 01080201
- 171Permits
- 338Permits in the subbasin
- 3States the subbasin touches
171 of the 338 Clean Water Act discharge permits in hydrologic subbasin 01080201 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MA, NH, VT.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 01080201 that carry that value: 171 of the 338 the subbasin holds, and the 8 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 01080201
- program: Biosolids 15
- program: POTW 25
- program: Storm Water Industrial 63
- major or minor: Major dischargers 13
- major or minor: Minor dischargers 294
- permit type: Associated permit records 18
- permit type: General permit coverage 290
- permit type: Individual permits 30
Every discharge permit in subbasin 01080201 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 01080201, listing 171 permits under Storm Water Construction. The whole watershed holds 274 permits in MA, 62 in NH and 2 in VT, with 338 permits across all cuts.