Watershed · by program
Storm Water Construction discharge permits in subbasin 01080206
- 51Permits
- 84Permits in the subbasin
- 1States the subbasin touches
51 of the 84 Clean Water Act discharge permits in hydrologic subbasin 01080206 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MA.
Where the subbasin lies
- MA 84 permits in the subbasin
Other cuts of subbasin 01080206
- permit type: General permit coverage 77
- major or minor: Minor dischargers 75
- program: Storm Water Industrial 11
- program: POTW 5
- permit type: Individual permits 4
- permit type: Associated permit records 3
Every discharge permit in subbasin 01080206 →
Figures from EPA’s ICIS-NPDES download.