Watershed · by program
Storm Water Construction discharge permits in subbasin 01090002
- 362Permits
- 569Permits in the subbasin
- 2States the subbasin touches
362 of the 569 Clean Water Act discharge permits in hydrologic subbasin 01090002 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MA, RI.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 01090002 that carry that value: 362 of the 569 the subbasin holds, and the 8 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 01090002
- program: Biosolids 8
- program: POTW 10
- program: Storm Water Industrial 64
- major or minor: Major dischargers 8
- major or minor: Minor dischargers 488
- permit type: Associated permit records 12
- permit type: General permit coverage 535
- permit type: Individual permits 22
Every discharge permit in subbasin 01090002 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 01090002 by the program they are issued under. Storm Water Construction permits on this page number 362. The whole watershed holds 564 permits located in MA, 5 located in RI, and 569 permits across all cuts together.