Watershed · by program
Storm Water Construction discharge permits in subbasin 01090005
- 6Permits
- 76Permits in the subbasin
- 2States the subbasin touches
6 of the 76 Clean Water Act discharge permits in hydrologic subbasin 01090005 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in RI, CT.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 01090005 that carry that value: 6 of the 76 the subbasin holds, and the 8 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 01090005
- program: Biosolids 4
- program: Storm Water Industrial 43
- program: Storm Water Small MS4s 6
- major or minor: Major dischargers 4
- major or minor: Minor dischargers 70
- permit type: Associated permit records 8
- permit type: General permit coverage 58
- permit type: Individual permits 9
Every discharge permit in subbasin 01090005 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 01090005 under the Storm Water Construction program. It lists 6 permits on this page. The whole watershed has 71 permits located in RI, 5 permits located in CT, and 76 permits across all cuts together.