Watershed · by program
Storm Water Construction discharge permits in subbasin 02020001
- 17Permits
- 33Permits in the subbasin
- 1States the subbasin touches
17 of the 33 Clean Water Act discharge permits in hydrologic subbasin 02020001 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in NY.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 02020001 that carry that value: 17 of the 33 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- NY 33 permits in the subbasin
Other cuts of subbasin 02020001
- program: POTW 3
- major or minor: Minor dischargers 33
- permit type: General permit coverage 20
- permit type: Individual permits 11
Every discharge permit in subbasin 02020001 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 02020001 under the Storm Water Construction program. It lists 17 permits on this page, and 33 permits in the whole watershed located in NY. The whole watershed, all cuts together, holds 33 permits.