Watershed · by program
Storm Water Construction discharge permits in subbasin 02020005
- 63Permits
- 108Permits in the subbasin
- 1States the subbasin touches
63 of the 108 Clean Water Act discharge permits in hydrologic subbasin 02020005 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in NY.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 02020005 that carry that value: 63 of the 108 the subbasin holds, and the 7 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- NY 108 permits in the subbasin
Other cuts of subbasin 02020005
- program: CAFO 6
- program: POTW 10
- program: Storm Water Industrial 4
- major or minor: Minor dischargers 108
- permit type: General permit coverage 69
- permit type: Individual permits 34
- permit type: State-issued individual permits 4
Every discharge permit in subbasin 02020005 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 02020005 under the Storm Water Construction program. It lists 63 permits on this page, and 108 permits in the whole watershed located in NY.