Watershed · by program
Storm Water Construction discharge permits in subbasin 03050206
- 103Permits
- 137Permits in the subbasin
- 2States the subbasin touches
103 of the 137 Clean Water Act discharge permits in hydrologic subbasin 03050206 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in SC, GA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03050206 that carry that value: 103 of the 137 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 03050206
- program: Storm Water Industrial 13
- major or minor: Minor dischargers 136
- permit type: General permit coverage 133
- permit type: Individual permits 4
Every discharge permit in subbasin 03050206 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits for Storm Water Construction in watershed 03050206. It shows 103 permits on this page, and 137 permits in the whole watershed, with 135 in SC and 2 in GA.