Watershed · by program
Storm Water Construction discharge permits in subbasin 03050209
- 77Permits
- 85Permits in the subbasin
- 1States the subbasin touches
77 of the 85 Clean Water Act discharge permits in hydrologic subbasin 03050209 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in SC.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03050209 that carry that value: 77 of the 85 the subbasin holds, and the 2 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- SC 85 permits in the subbasin
Every discharge permit in subbasin 03050209 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 03050209 under the Storm Water Construction program. The page lists 77 permits, and the whole watershed located in SC has 85 permits.