EPA · discharge permits by watershed
Dozier Branch-Little River (subwatershed 030601050403)
- 11Current permits
- 1States
A subwatershed is a unit of the national Watershed Boundary Dataset, and water crosses state lines: this one carries permits in Georgia. Each permit is placed by the outfall EPA names as its representative discharge point.
By state
- Georgia11
Permits discharging here
| Permit holder | NPDES ID | City | State | Program | Discharger | Receiving water |
|---|---|---|---|---|---|---|
| 4181 OLD LINCOLNTON RD | GAR18B610 | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| 4191 OLD LINCOLNTON RD | GAR18B4F9 | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| ABUNDANCE POINTE | GAR3957C6 | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| HARD LABOR CREEK DAM | GAR144288 | SOCIAL CIRCLE | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| HARD LABOR CREEK RAW WATER INTAKE | GAR241864 | UNKNOWN | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| KAMPER KLUB ROAD PAVING | GAR2493B4 | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| MISTLETOE ROAD BOAT SHED | GAR18B1DC | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| RABBIT RUN FARMS PHASE I | GAR395A82 | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| RABBIT RUN FARMS PHASE II | GAR395A83 | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| RABBIT RUN FARMS, PHASE 1 - LOT 6 | GAR3973CA | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |
| RABITT RUN FARMS, PHASE 1 - LOT 15 | GAR397380 | APPLING | GA | Construction stormwater | Minor | Dozier Branch-Little River |