Watershed · by program
Storm Water Construction discharge permits in subbasin 03060110
- 315Permits
- 340Permits in the subbasin
- 2States the subbasin touches
315 of the 340 Clean Water Act discharge permits in hydrologic subbasin 03060110 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in SC, GA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03060110 that carry that value: 315 of the 340 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 03060110
- program: POTW 4
- program: Storm Water Industrial 6
- major or minor: Minor dischargers 337
- permit type: General permit coverage 332
- permit type: Individual permits 6
Every discharge permit in subbasin 03060110 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 03060110 under the Storm Water Construction program. It lists 315 permits on this page, and the whole watershed has 340 permits across all cuts, with 307 located in SC and 33 located in GA.