Watershed · by program
POTW discharge permits in subbasin 03070105
- 21Permits
- 137Permits in the subbasin
- 1States the subbasin touches
21 of the 137 Clean Water Act discharge permits in hydrologic subbasin 03070105 are filed as POTW. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in GA.
A cut is one value of one dimension of a subbasin — POTW, under program. This page holds the permits in subbasin 03070105 that carry that value: 21 of the 137 the subbasin holds, and the 7 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- GA 137 permits in the subbasin
Other cuts of subbasin 03070105
- program: Storm Water Construction 87
- program: Storm Water Industrial 11
- major or minor: Major dischargers 7
- major or minor: Minor dischargers 130
- permit type: General permit coverage 103
- permit type: Individual permits 27
- permit type: State-issued individual permits 6
Every discharge permit in subbasin 03070105 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 03070105 under the POTW program, with 21 permits shown. The whole watershed located in GA has 137 permits, and all cuts together total 137 permits.