Watershed · by program
Storm Water Construction discharge permits in subbasin 03080203
- 435Permits
- 519Permits in the subbasin
- 1States the subbasin touches
435 of the 519 Clean Water Act discharge permits in hydrologic subbasin 03080203 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in FL.
Where the subbasin lies
- FL 519 permits in the subbasin
Other cuts of subbasin 03080203
- major or minor: Minor dischargers 517
- permit type: General permit coverage 503
- program: Storm Water Industrial 45
- permit type: Individual permits 8
- permit type: Associated permit records 7
- program: Biosolids 7
Every discharge permit in subbasin 03080203 →
Figures from EPA’s ICIS-NPDES download.