Watershed · by program
Storm Water Construction discharge permits in subbasin 03090103
- 14Permits
- 21Permits in the subbasin
- 1States the subbasin touches
14 of the 21 Clean Water Act discharge permits in hydrologic subbasin 03090103 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in FL.
Where the subbasin lies
- FL 21 permits in the subbasin
Other cuts of subbasin 03090103
- major or minor: Minor dischargers 21
- permit type: General permit coverage 20
- program: Storm Water Industrial 4
Every discharge permit in subbasin 03090103 →
Figures from EPA’s ICIS-NPDES download.