Watershed · by program
Storm Water Construction discharge permits in subbasin 03100202
- 220Permits
- 302Permits in the subbasin
- 1States the subbasin touches
220 of the 302 Clean Water Act discharge permits in hydrologic subbasin 03100202 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in FL.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03100202 that carry that value: 220 of the 302 the subbasin holds, and the 6 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- FL 302 permits in the subbasin
Other cuts of subbasin 03100202
- program: Storm Water Industrial 30
- program: Storm Water Medium/Large MS4s 3
- major or minor: Major dischargers 6
- major or minor: Minor dischargers 296
- permit type: General permit coverage 292
- permit type: Individual permits 8
Every discharge permit in subbasin 03100202 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 03100202 under the Storm Water Construction program. It shows 220 permits for Storm Water Construction and 302 permits in the whole watershed located in FL.