Watershed · by program
Storm Water Construction discharge permits in subbasin 03100208
- 261Permits
- 357Permits in the subbasin
- 1States the subbasin touches
261 of the 357 Clean Water Act discharge permits in hydrologic subbasin 03100208 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in FL.
Where the subbasin lies
- FL 357 permits in the subbasin
Other cuts of subbasin 03100208
- major or minor: Minor dischargers 357
- permit type: General permit coverage 340
- program: Storm Water Industrial 45
- permit type: Associated permit records 10
- program: Biosolids 8
- permit type: Individual permits 5
Every discharge permit in subbasin 03100208 →
Figures from EPA’s ICIS-NPDES download.