Watershed · by program
Storm Water Construction discharge permits in subbasin 03110201
- 54Permits
- 75Permits in the subbasin
- 2States the subbasin touches
54 of the 75 Clean Water Act discharge permits in hydrologic subbasin 03110201 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in GA, FL.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03110201 that carry that value: 54 of the 75 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 03110201
- program: Storm Water Industrial 13
- major or minor: Major dischargers 3
- major or minor: Minor dischargers 72
- permit type: General permit coverage 71
- permit type: Individual permits 3
Every discharge permit in subbasin 03110201 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 03110201, filtered by the Storm Water Construction program. It lists 54 permits on this page, out of 75 permits in the whole watershed.