Watershed · by program
Storm Water Construction discharge permits in subbasin 03120002
- 73Permits
- 127Permits in the subbasin
- 1States the subbasin touches
73 of the 127 Clean Water Act discharge permits in hydrologic subbasin 03120002 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in GA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03120002 that carry that value: 73 of the 127 the subbasin holds, and the 9 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- GA 127 permits in the subbasin
Other cuts of subbasin 03120002
- program: Biosolids 3
- program: POTW 11
- program: Storm Water Industrial 18
- major or minor: Major dischargers 6
- major or minor: Minor dischargers 121
- permit type: Associated permit records 3
- permit type: General permit coverage 100
- permit type: Individual permits 18
- permit type: State-issued individual permits 6
Every discharge permit in subbasin 03120002 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits for Storm Water Construction in watershed 03120002. It shows 73 permits on this page, out of 127 permits in the whole watershed located in GA.