Watershed · by program
Storm Water Construction discharge permits in subbasin 03140201
- 190Permits
- 350Permits in the subbasin
- 1States the subbasin touches
190 of the 350 Clean Water Act discharge permits in hydrologic subbasin 03140201 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AL.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03140201 that carry that value: 190 of the 350 the subbasin holds, and the 8 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- AL 350 permits in the subbasin
Other cuts of subbasin 03140201
- program: Biosolids 5
- program: POTW 13
- program: Storm Water Industrial 69
- major or minor: Major dischargers 7
- major or minor: Minor dischargers 343
- permit type: Associated permit records 5
- permit type: General permit coverage 279
- permit type: Individual permits 66
Every discharge permit in subbasin 03140201 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 03140201 under the Storm Water Construction program. It lists 190 permits on this page, out of 350 permits in the whole watershed located in AL and 350 permits in the whole watershed across all cuts.