Watershed · by permit type
General permit coverage discharge permits in subbasin 03140305
- 87Permits
- 109Permits in the subbasin
- 2States the subbasin touches
87 of the 109 Clean Water Act discharge permits in hydrologic subbasin 03140305 are filed as General permit coverage. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AL, FL.
A cut is one value of one dimension of a subbasin — General permit coverage, under permit type. This page holds the permits in subbasin 03140305 that carry that value: 87 of the 109 the subbasin holds, and the 7 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 03140305
- program: Biosolids 5
- program: Storm Water Construction 37
- program: Storm Water Industrial 34
- major or minor: Major dischargers 3
- major or minor: Minor dischargers 106
- permit type: Associated permit records 5
- permit type: Individual permits 17
Every discharge permit in subbasin 03140305 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 03140305, showing permits by the kind of permit the agency issued. It lists 87 permits under the permit type General permit coverage. The whole watershed has 109 permits across all cuts together, including 60 in AL and 49 in FL.