Watershed · by program
Storm Water Construction discharge permits in subbasin 03150106
- 377Permits
- 751Permits in the subbasin
- 2States the subbasin touches
377 of the 751 Clean Water Act discharge permits in hydrologic subbasin 03150106 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AL, GA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03150106 that carry that value: 377 of the 751 the subbasin holds, and the 9 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 03150106
- program: Biosolids 13
- program: POTW 30
- program: Storm Water Industrial 189
- program: Storm Water Small MS4s 13
- major or minor: Major dischargers 14
- major or minor: Minor dischargers 736
- permit type: Associated permit records 14
- permit type: General permit coverage 639
- permit type: Individual permits 98
Every discharge permit in subbasin 03150106 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 03150106 under the Storm Water Construction program. It shows 377 permits on this page, out of 748 permits in the whole watershed located in AL and 3 permits in the whole watershed located in GA. Across all cuts together, the whole watershed has 751 permits.