Watershed · by program
Storm Water Construction discharge permits in subbasin 03160103
- 10Permits
- 74Permits in the subbasin
- 3States the subbasin touches
10 of the 74 Clean Water Act discharge permits in hydrologic subbasin 03160103 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AL, MS, GA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03160103 that carry that value: 10 of the 74 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 03160103
- program: POTW 6
- program: Storm Water Industrial 30
- major or minor: Minor dischargers 73
- permit type: General permit coverage 57
- permit type: Individual permits 16
Every discharge permit in subbasin 03160103 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 03160103 under the Storm Water Construction program. The page shows 10 permits, and the whole watershed has 74 permits across all programs, with 69 in AL, 4 in MS, and 1 in GA.