Watershed · by program
Storm Water Construction discharge permits in subbasin 03160201
- 45Permits
- 121Permits in the subbasin
- 1States the subbasin touches
45 of the 121 Clean Water Act discharge permits in hydrologic subbasin 03160201 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AL.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 03160201 that carry that value: 45 of the 121 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- AL 121 permits in the subbasin
Other cuts of subbasin 03160201
- program: POTW 6
- program: Storm Water Industrial 40
- major or minor: Minor dischargers 117
- permit type: General permit coverage 106
- permit type: Individual permits 14
Every discharge permit in subbasin 03160201 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits for Storm Water Construction in watershed 03160201. It shows 45 permits for this program, out of 121 permits in the whole watershed located in AL and 121 permits in the whole watershed across all cuts.