Watershed · by program
POTW discharge permits in subbasin 04010101
- 4Permits
- 14Permits in the subbasin
- 1States the subbasin touches
4 of the 14 Clean Water Act discharge permits in hydrologic subbasin 04010101 are filed as POTW. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MN.
Where the subbasin lies
- MN 14 permits in the subbasin
Other cuts of subbasin 04010101
- program: Storm Water Construction 4
- major or minor: Minor dischargers 13
- permit type: General permit coverage 7
- permit type: Individual permits 7
Every discharge permit in subbasin 04010101 →
Figures from EPA’s ICIS-NPDES download.