Watershed · by permit type
General permit coverage discharge permits in subbasin 04020105
- 14Permits
- 18Permits in the subbasin
- 1States the subbasin touches
14 of the 18 Clean Water Act discharge permits in hydrologic subbasin 04020105 are filed as General permit coverage. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MI.
Where the subbasin lies
- MI 18 permits in the subbasin
Other cuts of subbasin 04020105
Every discharge permit in subbasin 04020105 →
Figures from EPA’s ICIS-NPDES download.