Watershed · by program
Storm Water Construction discharge permits in subbasin 04030202
- 24Permits
- 243Permits in the subbasin
- 2States the subbasin touches
24 of the 243 Clean Water Act discharge permits in hydrologic subbasin 04030202 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in WI, IL.
Where the subbasin lies
Other cuts of subbasin 04030202
- major or minor: Minor dischargers 237
- permit type: General permit coverage 177
- permit type: Individual permits 66
- program: POTW 37
- program: CAFO 13
- major or minor: Major dischargers 3
Every discharge permit in subbasin 04030202 →
Figures from EPA’s ICIS-NPDES download.