Watershed · by program
Storm Water Construction discharge permits in subbasin 04130002
- 44Permits
- 82Permits in the subbasin
- 2States the subbasin touches
44 of the 82 Clean Water Act discharge permits in hydrologic subbasin 04130002 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in NY, PA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 04130002 that carry that value: 44 of the 82 the subbasin holds, and the 7 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 04130002
- program: CAFO 3
- program: POTW 7
- program: Storm Water Industrial 6
- major or minor: Minor dischargers 82
- permit type: General permit coverage 56
- permit type: Individual permits 20
- permit type: State-issued individual permits 4
Every discharge permit in subbasin 04130002 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 04130002 by program. It shows 44 Storm Water Construction permits. The whole watershed has 77 permits in NY, 5 in PA, and 82 permits across all cuts.