Watershed · by program
Storm Water Construction discharge permits in subbasin 05080003
- 110Permits
- 203Permits in the subbasin
- 4States the subbasin touches
110 of the 203 Clean Water Act discharge permits in hydrologic subbasin 05080003 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in IN, OH, GA, IL.
Where the subbasin lies
- IN 184 permits in the subbasin
- OH 17 permits in the subbasin
- GA 1 permits in the subbasin
- IL 1 permits in the subbasin
Other cuts of subbasin 05080003
- major or minor: Minor dischargers 199
- permit type: Individual permits 101
- permit type: General permit coverage 100
- program: Storm Water Industrial 27
- program: POTW 21
- major or minor: Major dischargers 4
Every discharge permit in subbasin 05080003 →
Figures from EPA’s ICIS-NPDES download.