A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: a permit is placed here by the outfall EPA names as its representative discharge point.
3 of the permits in subbasin 06010107 carry a numeric limit on BOD, 5-day, percent removal, and 3 of those have a recorded exceedance. Nationwide the same parameter appears in 3,963 permits. A permit carrying several parameters is counted under each of them, so the parameter counts for one subbasin add up to more permits than it holds. The other parameters named in this subbasin are listed below.
Permits
Other pollutants in subbasin 06010107
- Zinc, total [as Zn] 3
- Aluminum, total [as Al] 3
- Toluene 3
- Benzene 3
- Ethylbenzene 3
- Floating solids, waste or visible foam-visual 3
- Flow, in conduit or thru treatment plant 31
- Chlorine, total residual 12
- E. coli 6
- SSO, Dry Weather 6
- SSO, Wet Weather 6
- Release [Sewer], Dry Weather 6
- Release [Sewer], Wet Weather 6
- Bypass of Treatment Facility 6
- BOD, carbonaceous [5 day, 20 C] 5
- BOD, carbonaceous, percent removal 4
- Solids, suspended percent removal 7
- Xylene [mix of m+o+p] 3
- IC25 Static Renewal 7 Day Chronic Ceriodaphnia dubia 5
- IC25 Static Renewal 7 Day Chronic Chrpimephales 5
BOD, 5-day, percent removal nationwide · Subbasin 06010107, every permit
What this page shows
This page covers Clean Water Act discharge permits in watershed 06010107 with limits on the pollutant parameter BOD, 5-day, percent removal. It lists 3 permits in this watershed with a limit on this parameter and 3 permits in this watershed with a recorded violation of this parameter.