Watershed · by program
POTW discharge permits in subbasin 06010208
- 8Permits
- 191Permits in the subbasin
- 1States the subbasin touches
8 of the 191 Clean Water Act discharge permits in hydrologic subbasin 06010208 are filed as POTW. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in TN.
A cut is one value of one dimension of a subbasin — POTW, under program. This page holds the permits in subbasin 06010208 that carry that value: 8 of the 191 the subbasin holds, and the 7 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- TN 191 permits in the subbasin
Other cuts of subbasin 06010208
- program: Biosolids 4
- program: Storm Water Construction 111
- program: Storm Water Industrial 47
- major or minor: Minor dischargers 188
- permit type: Associated permit records 4
- permit type: General permit coverage 162
- permit type: Individual permits 25
Every discharge permit in subbasin 06010208 →
Figures from EPA’s ICIS-NPDES download.
The Pay Desk is the free weekly executive pay briefing — one company at a time, every number traceable to a public filing.We’ll email you a link to confirm. Unsubscribe any time.