Watershed · by program
POTW discharge permits in subbasin 06040004
- 6Permits
- 35Permits in the subbasin
- 1States the subbasin touches
6 of the 35 Clean Water Act discharge permits in hydrologic subbasin 06040004 are filed as POTW. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in TN.
A cut is one value of one dimension of a subbasin — POTW, under program. This page holds the permits in subbasin 06040004 that carry that value: 6 of the 35 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- TN 35 permits in the subbasin
Other cuts of subbasin 06040004
- program: Storm Water Construction 16
- program: Storm Water Industrial 8
- major or minor: Minor dischargers 33
- permit type: General permit coverage 28
- permit type: Individual permits 6
Every discharge permit in subbasin 06040004 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 06040004 by the program they are issued under. The page shows 6 POTW permits, and the whole watershed located in TN has 35 permits across all cuts together.