Watershed · by program
Storm Water Construction discharge permits in subbasin 07010206
- 5Permits
- 95Permits in the subbasin
- 2States the subbasin touches
5 of the 95 Clean Water Act discharge permits in hydrologic subbasin 07010206 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MN, ND.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 07010206 that carry that value: 5 of the 95 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 07010206
- program: POTW 10
- major or minor: Major dischargers 11
- major or minor: Minor dischargers 84
- permit type: General permit coverage 40
- permit type: Individual permits 53
Every discharge permit in subbasin 07010206 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists 5 Clean Water Act discharge permits for the Storm Water Construction program in watershed 07010206. The whole watershed contains 89 permits in MN and 6 permits in ND, for a total of 95 permits.