Watershed · by program
Storm Water Construction discharge permits in subbasin 07050002
- 8Permits
- 25Permits in the subbasin
- 1States the subbasin touches
8 of the 25 Clean Water Act discharge permits in hydrologic subbasin 07050002 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in WI.
Where the subbasin lies
- WI 25 permits in the subbasin
Other cuts of subbasin 07050002
- major or minor: Minor dischargers 22
- permit type: General permit coverage 19
- permit type: Individual permits 6
- program: POTW 4
Every discharge permit in subbasin 07050002 →
Figures from EPA’s ICIS-NPDES download.