Watershed · by permit type
General permit coverage discharge permits in subbasin 08010203
- 160Permits
- 217Permits in the subbasin
- 1States the subbasin touches
160 of the 217 Clean Water Act discharge permits in hydrologic subbasin 08010203 are filed as General permit coverage. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in TN.
A cut is one value of one dimension of a subbasin — General permit coverage, under permit type. This page holds the permits in subbasin 08010203 that carry that value: 160 of the 217 the subbasin holds, and the 8 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- TN 217 permits in the subbasin
Other cuts of subbasin 08010203
- program: Biosolids 4
- program: POTW 14
- program: Storm Water Construction 124
- program: Storm Water Industrial 43
- major or minor: Major dischargers 3
- major or minor: Minor dischargers 213
- permit type: Associated permit records 4
- permit type: Individual permits 53
Every discharge permit in subbasin 08010203 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 08010203, listed under General permit coverage. The page lists 160 permits, while the whole watershed located in TN has 217 permits.