Watershed · by program
Storm Water Construction discharge permits in subbasin 08020205
- 20Permits
- 61Permits in the subbasin
- 2States the subbasin touches
20 of the 61 Clean Water Act discharge permits in hydrologic subbasin 08020205 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AR, MS.
Where the subbasin lies
Other cuts of subbasin 08020205
- major or minor: Minor dischargers 57
- permit type: General permit coverage 48
- program: Storm Water Industrial 19
- permit type: Individual permits 11
- program: POTW 7
- major or minor: Major dischargers 3
Every discharge permit in subbasin 08020205 →
Figures from EPA’s ICIS-NPDES download.