Watershed · by program
Storm Water Construction discharge permits in subbasin 08020301
- 74Permits
- 130Permits in the subbasin
- 1States the subbasin touches
74 of the 130 Clean Water Act discharge permits in hydrologic subbasin 08020301 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AR.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 08020301 that carry that value: 74 of the 130 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- AR 130 permits in the subbasin
Other cuts of subbasin 08020301
- program: POTW 11
- program: Storm Water Industrial 20
- major or minor: Minor dischargers 129
- permit type: General permit coverage 114
- permit type: Individual permits 16
Every discharge permit in subbasin 08020301 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 08020301 under the Storm Water Construction program. It lists 74 permits on this page, and the whole watershed located in AR has 130 permits.