Watershed · by program
Storm Water Construction discharge permits in subbasin 08030207
- 7Permits
- 85Permits in the subbasin
- 2States the subbasin touches
7 of the 85 Clean Water Act discharge permits in hydrologic subbasin 08030207 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MS, GA.
Where the subbasin lies
Other cuts of subbasin 08030207
- major or minor: Minor dischargers 80
- permit type: Individual permits 61
- program: POTW 36
- permit type: General permit coverage 20
- major or minor: Major dischargers 4
- permit type: Associated permit records 4
- program: Biosolids 4
Every discharge permit in subbasin 08030207 →
Figures from EPA’s ICIS-NPDES download.