Watershed · by program
Storm Water Construction discharge permits in subbasin 08040101
- 62Permits
- 155Permits in the subbasin
- 2States the subbasin touches
62 of the 155 Clean Water Act discharge permits in hydrologic subbasin 08040101 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AR, GA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 08040101 that carry that value: 62 of the 155 the subbasin holds, and the 6 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 08040101
- program: POTW 8
- program: Storm Water Industrial 40
- major or minor: Major dischargers 6
- major or minor: Minor dischargers 149
- permit type: General permit coverage 113
- permit type: Individual permits 40
Every discharge permit in subbasin 08040101 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 08040101 under the Storm Water Construction program. It lists 62 permits on this page, out of 155 permits in the whole watershed, with 154 located in AR and 1 located in GA.