Watershed · by program
Storm Water Construction discharge permits in subbasin 08040202
- 16Permits
- 70Permits in the subbasin
- 2States the subbasin touches
16 of the 70 Clean Water Act discharge permits in hydrologic subbasin 08040202 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AR, LA.
Where the subbasin lies
Other cuts of subbasin 08040202
- major or minor: Minor dischargers 65
- permit type: General permit coverage 55
- program: Storm Water Industrial 29
- permit type: Individual permits 14
- major or minor: Major dischargers 5
- program: POTW 3
Every discharge permit in subbasin 08040202 →
Figures from EPA’s ICIS-NPDES download.