Watershed · by program
Storm Water Construction discharge permits in subbasin 08040202
- 16Permits
- 70Permits in the subbasin
- 2States the subbasin touches
16 of the 70 Clean Water Act discharge permits in hydrologic subbasin 08040202 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AR, LA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 08040202 that carry that value: 16 of the 70 the subbasin holds, and the 6 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 08040202
- program: POTW 3
- program: Storm Water Industrial 29
- major or minor: Major dischargers 5
- major or minor: Minor dischargers 65
- permit type: General permit coverage 55
- permit type: Individual permits 14
Every discharge permit in subbasin 08040202 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 08040202 under the Storm Water Construction program. It shows 16 permits on this page, and 65 permits in the whole watershed located in AR and 5 permits in the whole watershed located in LA, for 70 permits in the whole watershed across all cuts.