Watershed · by program
Storm Water Construction discharge permits in subbasin 08040203
- 115Permits
- 242Permits in the subbasin
- 1States the subbasin touches
115 of the 242 Clean Water Act discharge permits in hydrologic subbasin 08040203 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AR.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 08040203 that carry that value: 115 of the 242 the subbasin holds, and the 8 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- AR 242 permits in the subbasin
Other cuts of subbasin 08040203
- program: Biosolids 3
- program: POTW 9
- program: Storm Water Industrial 37
- major or minor: Major dischargers 7
- major or minor: Minor dischargers 235
- permit type: Associated permit records 3
- permit type: General permit coverage 213
- permit type: Individual permits 26
Every discharge permit in subbasin 08040203 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 08040203. It lists 115 Storm Water Construction permits. The whole watershed located in AR has 242 permits.