Watershed · by program
Storm Water Construction discharge permits in subbasin 08050002
- 3Permits
- 28Permits in the subbasin
- 2States the subbasin touches
3 of the 28 Clean Water Act discharge permits in hydrologic subbasin 08050002 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AR, LA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 08050002 that carry that value: 3 of the 28 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 08050002
- program: POTW 6
- major or minor: Minor dischargers 27
- permit type: General permit coverage 14
- permit type: Individual permits 12
Every discharge permit in subbasin 08050002 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 08050002 by program, and it shows 3 Storm Water Construction permits. The whole watershed holds 15 permits in AR and 13 permits in LA, with 28 permits across all cuts.