Watershed · by program
Storm Water Construction discharge permits in subbasin 08080202
- 6Permits
- 48Permits in the subbasin
- 3States the subbasin touches
6 of the 48 Clean Water Act discharge permits in hydrologic subbasin 08080202 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in LA, TX, AR.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 08080202 that carry that value: 6 of the 48 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 08080202
- program: POTW 5
- program: Storm Water Industrial 3
- major or minor: Minor dischargers 47
- permit type: General permit coverage 24
- permit type: Individual permits 23
Every discharge permit in subbasin 08080202 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 08080202 under the Storm Water Construction program, with 6 permits on this page. The whole watershed has 45 permits located in LA, 2 in TX, and 1 in AR, and 48 permits across all cuts.