Watershed · by program
Storm Water Construction discharge permits in subbasin 08080206
- 37Permits
- 193Permits in the subbasin
- 2States the subbasin touches
37 of the 193 Clean Water Act discharge permits in hydrologic subbasin 08080206 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in LA, TX.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 08080206 that carry that value: 37 of the 193 the subbasin holds, and the 8 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 08080206
- program: Biosolids 4
- program: POTW 6
- program: Storm Water Industrial 11
- major or minor: Major dischargers 21
- major or minor: Minor dischargers 172
- permit type: Associated permit records 4
- permit type: General permit coverage 132
- permit type: Individual permits 56
Every discharge permit in subbasin 08080206 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 08080206 by program. It shows 37 Storm Water Construction permits. The whole watershed has 191 permits located in LA, 2 located in TX, and 193 permits across all cuts.