Watershed · by program
Storm Water Construction discharge permits in subbasin 08090302
- 24Permits
- 211Permits in the subbasin
- 3States the subbasin touches
24 of the 211 Clean Water Act discharge permits in hydrologic subbasin 08090302 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in LA, GA, TX.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 08090302 that carry that value: 24 of the 211 the subbasin holds, and the 9 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 08090302
- program: Biosolids 4
- program: POTW 11
- program: Storm Water Industrial 9
- major or minor: Major dischargers 8
- major or minor: Minor dischargers 203
- permit type: Associated permit records 5
- permit type: General permit coverage 87
- permit type: Individual permits 116
- permit type: State-issued individual permits 3
Every discharge permit in subbasin 08090302 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 08090302 under the Storm Water Construction program, with 24 permits listed. In the whole watershed, 202 permits are located in LA, 7 in GA and 2 in TX, and 211 permits are counted across all cuts together.