Watershed · by program
Storm Water Construction discharge permits in subbasin 09020311
- 4Permits
- 16Permits in the subbasin
- 2States the subbasin touches
4 of the 16 Clean Water Act discharge permits in hydrologic subbasin 09020311 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in ND, MN.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 09020311 that carry that value: 4 of the 16 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 09020311
- program: POTW 6
- major or minor: Minor dischargers 15
- permit type: General permit coverage 12
- permit type: Individual permits 4
Every discharge permit in subbasin 09020311 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 09020311 by program type. It shows Storm Water Construction permits, with 4 permits on this page. The whole watershed has 11 permits in ND and 5 permits in MN, for 16 permits in the whole watershed across all cuts.